Bathroom – silicone joints

Bathroom – silicone joints in Zürich & surroundings – neat workmanship, technically correct.

Eurofugen – Bathroom – silicone joints in the Zürich area. We prepare the joint plan, verify substrate strength and movement, and select an approved system (neutral‑cure silicone, hybrid/MS polymer, PU) in strict accordance with manufacturer specs. Focus: Naturstein – Verfärbungsschutz. Planning priority: Bewegungsraster & Anschlussdetails. Standards: EN 15651 / ISO 11600 (sanitary), manufacturer data sheets.

Quality & acceptance

  • Joint width/depth per plan (≈ 2:1)
  • Crisp edges without staining
  • UV/weather‑resistant sealants fit to exposure
  • Uniform, slightly concave finish profile
  • Ensure bond at two flanks; prevent three‑sided adhesion using PE backer rod

Planning & preparation

Mock‑ups with cut‑and‑pull checks provide pre‑approval. Detailing at edges, reveals and penetrations is recorded in drawings. Create square, sound flanks, define depth and install the closed‑cell backer rod precisely. Joint layout based on panel sizes and anticipated movement; critical edge zones are eased. We verify weather and dew point; application only on dry, load‑bearing flanks. Primers are chosen per substrate absorption (e.g., clinker, fair‑faced concrete, fibre cement).

Application & control

Random cut‑and‑pull checks, width/depth measurements and visual inspection are recorded. Apply sealant without bubbles, fill the joint evenly and tool to a slightly concave profile. Maintain movement capability; remove masking in due time and verify edge adhesion. Transitions at profile joints and material changes are re‑worked separately. Use UV‑stable systems and protect adjacent surfaces from contamination.

Joint routing aligns with the building’s movement grid.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

On natural stone we use low‑migration, stone‑safe systems.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

On natural stone we use low‑migration, stone‑safe systems.

On natural stone we use low‑migration, stone‑safe systems.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

On natural stone we use low‑migration, stone‑safe systems.

Care guidance and maintenance intervals are included at handover.

Care guidance and maintenance intervals are included at handover.

Joint routing aligns with the building’s movement grid.

Care guidance and maintenance intervals are included at handover.

Care guidance and maintenance intervals are included at handover.

Care guidance and maintenance intervals are included at handover.

Material batches and working times are recorded for traceability.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

Planning & preparation

Clean substrates, define edges and limit bond areas; primers & backer rod are matched to substrate and width. Mock‑ups and dew‑point checks secure approval. Interfaces are coordinated before start.

Application & control

Apply sealant bubble‑free, tool evenly and control dimensions. Check edge adhesion, remove masking in time and re‑work transitions neatly. Everything is recorded.

Frequently asked questions (Sanitary)

More services

Related Services

Discover more services.