Tub – connection joints

Tub – connection joints in Zürich & surroundings – precise execution, on‑schedule handover.

Eurofugen – Tub – connection joints in the Zürich area. We prepare the joint plan, verify substrate strength and movement, and select an approved system (neutral‑cure silicone, hybrid/MS polymer, PU) in strict accordance with manufacturer specs. Focus: Küche – Hygiene und Reinigung. Planning priority: Fugenaufbau (Hinterfüllprofil, Primer, 2:1‑Geometrie). Standards: EN 15651 / ISO 11600 (sanitary), manufacturer data sheets.

Quality & acceptance

  • Documented execution incl. photo record
  • Uniform, slightly concave finish profile
  • UV/weather‑resistant sealants fit to exposure
  • Ensure bond at two flanks; prevent three‑sided adhesion using PE backer rod
  • Crisp edges without staining

Planning & preparation

Mock‑ups with cut‑and‑pull checks provide pre‑approval. Detailing at edges, reveals and penetrations is recorded in drawings. We verify weather and dew point; application only on dry, load‑bearing flanks. Joint layout based on panel sizes and anticipated movement; critical edge zones are eased. Create square, sound flanks, define depth and install the closed‑cell backer rod precisely. Primers are chosen per substrate absorption (e.g., clinker, fair‑faced concrete, fibre cement).

Application & control

Transitions at profile joints and material changes are re‑worked separately. Use UV‑stable systems and protect adjacent surfaces from contamination. Random cut‑and‑pull checks, width/depth measurements and visual inspection are recorded. Apply sealant without bubbles, fill the joint evenly and tool to a slightly concave profile. Maintain movement capability; remove masking in due time and verify edge adhesion.

Care guidance and maintenance intervals are included at handover.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Care guidance and maintenance intervals are included at handover.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Joint routing aligns with the building’s movement grid.

On natural stone we use low‑migration, stone‑safe systems.

Planning & preparation

Clean substrates, define edges and limit bond areas; primers & backer rod are matched to substrate and width. Mock‑ups and dew‑point checks secure approval. Interfaces are coordinated before start.

Application & control

Apply sealant bubble‑free, tool evenly and control dimensions. Check edge adhesion, remove masking in time and re‑work transitions neatly. Everything is recorded.

Frequently asked questions (Sanitary)

More services

Related Services

Discover more services.