Basin – connection joints

Basin – connection joints in Central Switzerland – clean, tight and visually consistent.

Eurofugen – Basin – connection joints in the Zürich area. We prepare the joint plan, verify substrate strength and movement, and select an approved system (neutral‑cure silicone, hybrid/MS polymer, PU) in strict accordance with manufacturer specs. Focus: Feinsteinzeug – Haftflächenvorbereitung. Planning priority: Bewegungsraster & Anschlussdetails. Standards: EN 15651 / ISO 11600 (sanitary), manufacturer data sheets.

Quality & acceptance

  • Crisp edges without staining
  • Uniform, slightly concave finish profile
  • Joint width/depth per plan (≈ 2:1)
  • Documented execution incl. photo record
  • Ensure bond at two flanks; prevent three‑sided adhesion using PE backer rod

Planning & preparation

We verify weather and dew point; application only on dry, load‑bearing flanks. Create square, sound flanks, define depth and install the closed‑cell backer rod precisely. Detailing at edges, reveals and penetrations is recorded in drawings. Mock‑ups with cut‑and‑pull checks provide pre‑approval. Joint layout based on panel sizes and anticipated movement; critical edge zones are eased. Primers are chosen per substrate absorption (e.g., clinker, fair‑faced concrete, fibre cement).

Application & control

Transitions at profile joints and material changes are re‑worked separately. Random cut‑and‑pull checks, width/depth measurements and visual inspection are recorded. Maintain movement capability; remove masking in due time and verify edge adhesion. Use UV‑stable systems and protect adjacent surfaces from contamination. Apply sealant without bubbles, fill the joint evenly and tool to a slightly concave profile.

Care guidance and maintenance intervals are included at handover.

Material batches and working times are recorded for traceability.

Material batches and working times are recorded for traceability.

Care guidance and maintenance intervals are included at handover.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

On natural stone we use low‑migration, stone‑safe systems.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

On natural stone we use low‑migration, stone‑safe systems.

Joint routing aligns with the building’s movement grid.

On natural stone we use low‑migration, stone‑safe systems.

On natural stone we use low‑migration, stone‑safe systems.

Care guidance and maintenance intervals are included at handover.

Joint routing aligns with the building’s movement grid.

On natural stone we use low‑migration, stone‑safe systems.

On natural stone we use low‑migration, stone‑safe systems.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Planning & preparation

Clean substrates, define edges and limit bond areas; primers & backer rod are matched to substrate and width. Mock‑ups and dew‑point checks secure approval. Interfaces are coordinated before start.

Application & control

Apply sealant bubble‑free, tool evenly and control dimensions. Check edge adhesion, remove masking in time and re‑work transitions neatly. Everything is recorded.